Hunches Won’t Hold Back Warm Springs Run

At its October 20 meeting, the Bath Town Council could have rejected the Warm Springs Run flood study outright, ending any chance of learning or doing more. It did something quieter. The study had found two options whose benefits outweighed their costs: storage ponds upstream in the County and added stormwater capacity in town. The Council kept the ponds, dropped the in-town option, and added a second upstream project, a concrete dam that failed the cost-benefit test. Members said they would vote for the dam because “it’s not going anywhere.”

How this decision was made worries me as much as the decision itself. What members believed counted for more than what the evidence showed.

Personal impressions took the place of evidence. One heavy rain that didn’t flood was offered as proof that the run “did its ditch thing.” A member said the bypass has made conditions “literally better,” adding, “this is what I see.” But stormwater controls on a project like the bypass are designed to keep it from adding runoff, not to cure flooding that was already there. Watching a few storms cannot tell us what a big flood will do; the study can.

Expert findings were brushed aside. Members insisted that the County’s storage project could go ahead on its own, though federal rules say construction money comes only after a finished plan. They also insisted that every answer must lie upstream. Upstream storage is part of the answer, but when a community is built in the flood plain located in a narrow valley, there isn’t enough room upstream to hold back all the water. That is why a dam was never considered, and why it doesn’t work.

Finally, flooding was treated as a private problem. People in the floodplain “read the disclosure,” we heard, so any damage is theirs to pay for. Yet the same Council wants to fill our empty storefronts, most of which sit in that floodplain. Every prospective tenant will ask whether the building floods. “Buyer beware” won’t fill those storefronts. It will keep them empty.

This decision was not made with our town’s best interests in mind. It was shaped by what members preferred to believe, not by what Bath needs. The cost will fall on the homeowners, renters, and businesses along the run, and on all of us who depend on a healthy downtown and safe drinking water. When the next big flood comes, residents should remember how this choice was made. We can and should do better.

 

Category:
  • Blog
Share To:
Warm Springs Watershed Logo. It shows water on the left side with an icon of a shelter, and a greenway with trees on the right side.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.